Case Study

5 KLD ETP Plant at JMR Infra Moradabad

A 5kW residential solar solution installed for Rekha Pathak in Ghaziabad to power a sustainable home.

5 KLD ETP Plant at JMR Infra Moradabad

JMR INFRA is a well-known Ready-Mix Concrete company working in areas within 80 kilometers of Moradabad. With more than 5.5 years of experience, the company has served over 1,500 customers in residential, commercial, and government projects.

 

The company is managed by experienced second-generation contractors who have more than 26 years of experience in road and building construction work. JMR INFRA provides reliable and customized concrete solutions for large infrastructure projects.

5 KLD ETP Plant

Smart Wastewater Treatment in Action

Watch how the 5 KLD ETP Plant at JMR Infra, Moradabad operates to treat industrial wastewater efficiently. This case study highlights advanced treatment processes, improved water quality, and sustainable environmental practices in real-time.

Objectives

To treat wastewater produced during ready-mix concrete production and ensure safe wastewater discharge from the plant.

Koshish Sustainable Solutions

01.

To treat wastewater produced during ready-mix concrete manufacturing properly.

02.

Reduce harmful cement waste before releasing water into drainage systems.

03.

Treating industrial wastewater efficiently while making the environment sustainable. 

04.

Supporting sustainable wastewater treatment practices in construction material production.

Challenges

Different safety and environmental conditions at the site created difficulties during the Effluent Treatment Plant installation work.

Koshish Sustainable Solutions

Dust Exposure

Heavy dust and cement particles at the construction site required proper safety measures during installation activities.



Koshish Sustainable Solutions

Fine Particles

Fine cement dust in the surrounding area made the installation work more difficult and required extra safety precautions.

Koshish Sustainable Solutions

Active Construction

Ongoing construction work at the site created coordination problems during ETP installation and material movement.

Impact

The installed Effluent Treatment Plant improved wastewater treatment and made industrial wastewater discharge safer.

Wastewater Treatment

Large amounts of industrial wastewater are now treated properly before discharge.

Pollution Reduction

Proper treatment helps reduce harmful cement waste entering nearby drainage systems.

Safe Discharge

After full treatment, the wastewater is safely released into open drains.



Environmental Compliance

The system helps the company follow industrial wastewater treatment and environmental safety regulations.

Other case Studies

KOSHISH is an initiative by a team of young professionals from the Indian Institute of Technology.

This project showed how Koshish can transform Biogas challenges into opportunities.

Scroll to Top