Case Study

2 kW Solar plant, Laxman Singh, Faridabad

A 5kW residential solar solution installed for Rekha Pathak in Ghaziabad to power a sustainable home.

2 kW Solar plant, Laxman Singh, Faridabad

A 2 kW residential solar system was installed at Laxman Singh’s home in Faridabad to reduce electricity bills and improve daily power usage. The family wanted a simple and long-term solution for clean electricity and lower monthly energy expenses. 

 

During the rooftop inspection, the roof was found suitable for solar installation due to good sunlight availability throughout the day. Koshish India installed an efficient 2 kW residential solar system to meet daily household electricity needs in an affordable way. After installation, the system started generating clean solar energy and reduced dependence on grid electricity.

2 kW Solar plant

Efficient 2 kW Solar Power Installation in Faridabad

Discover how the 2 kW solar plant installed for Laxman Singh in Faridabad delivers reliable, eco-friendly, and cost-saving energy for residential use while supporting a greener future.

Objectives

The main goal of this solar project was to reduce electricity expenses and provide clean, reliable power for regular home use.



Koshish Sustainable Solutions

01.

To save money on monthly electricity bills.

02.

To provide a smooth power supply for household needs.

03.

To make better use of rooftop space for solar energy.

04.

To encourage clean and eco-friendly energy use at home.

Challenges

The solar installation required proper planning and technical adjustments for smooth operation and better energy generation.



Koshish Sustainable Solutions

Roof Space Management

The rooftop area required careful planning for proper and efficient solar panel installation work

Koshish Sustainable Solutions

Sunlight Direction

Panels needed correct angle positioning for better sunlight collection and improved energy generation

Koshish Sustainable Solutions

Electrical Safety

Safe wiring and protection measures were necessary during the complete solar system installation process

Impact

Installing solar power plants improves energy efficiency and provides reliable, clean electricity for regular household electrical activities.



Reduced Electricity Bills

The solar system helped reduce monthly electricity bills by up to 70–90% through solar power generation.

Payback Within 3–4 Years

The installation cost can be recovered within 3–4 years through regular electricity savings.

Savings on Daily Energy Costs

The family now spends much less on daily electricity usage compared to earlier power expenses.

Lower Environmental Impact

Using solar energy helps reduce carbon emissions and supports a greener environment.



Other case Studies

KOSHISH is an initiative by a team of young professionals from the Indian Institute of Technology.

This project showed how Koshish can transform Biogas challenges into opportunities.

Scroll to Top