After conducting a detailed inspection and performance analysis, we recommended upgrading the plant into a fully functional 25 CUM biogas system. The revamp process included structural strengthening, optimization of the anaerobic digestion chamber, improvement of slurry inlet and outlet mechanisms, and installation of enhanced gas storage and pressure regulation systems. The entire project was successfully completed in 2022 within just two months, ensuring minimal disruption to farm operations while significantly improving system efficiency and durability.
Following the upgrade, the biogas plant began operating smoothly and consistently, producing clean and reliable biogas to meet the farm’s daily energy needs. The improved system now ensures better waste-to-energy conversion, reduced operational costs, and lower environmental impact. With enhanced efficiency and stable performance, the 25 CUM plant supports sustainable dairy operations and long-term energy savings. The client expressed high satisfaction with the revamped system and the dependable results it continues to deliver.